An average of 9.55 million trips were made on the country’s 124,000km network each day, with traffic on the 22,000km high-speed network in particular reporting strong growth - an average of 639,000 passengers travelled between Beijing and Guangzhou every day.
Many of the passengers travelling between Beijing and Tianjin have used new Fuxing high-speed trains, with 19.5 train pairs, or 18% of the total fleet, in service on the line since August 21.
In addition, since it opened on August 8, the Changchun – Baicheng – Ulanhot line to Inner Mongolia has carried 30,000 passengers per day. The line has reduced journey times from 5h 18m previously to 3h 25min.