Metro construction underway in Urumqi

2018-03-14 13:36:00
Summary:The construction of Urumqi s Metro Line 4 has entered a new phase, with excavation of pits and tunnels underway at multiple sites, local media reported
The construction of Urumqi's Metro Line 4 has entered a new phase, with excavation of pits and tunnels underway at multiple sites, local media reported.

The project began in 2017 to build 16 stations along a 20.58-kilometer route that starts at Bainiao Lake and ends at Badaowan Vehicle Base.

Four of the line's 16 stations are expected to wrap up construction this year, with an investment of about 3 billion yuan ($190 million). The whole project targets completion and trial runs in 2021.

Ally Information

World Railway Magazine

E-Magazine weekly

Set home | Favorites | About Us | Advertising | Contact Us | Copyright | sitemap

Copyright2004-2014 © Beijing Ally Information Inc.All rights reserved